~elevator 16
Time logged: 39 hrs
- Entry Time spent
- Rigging the elevator 4 hrs
- Elevator push rod 1 hrs
- Installed the elevator 2 hrs
- Trim motor install 0.5 hrs
- Elevator rivet filling 0.5 hrs
- Elevator trim tab install 2 hrs
- Trim motor wiring 1 hrs
- Mounting elevator tip 6 hrs
- Elevator tip forming and shortening rivets 2 hrs
- Elevator bottom skin, and trim motor hardware 3 hrs
- Elevator trim tab fitting problem 1 hrs
- Elevator skin fitting and safety wire 2 hrs
- Elevator skin prep and inspection hatch 2 hrs
- Elevator rib1 rework and spar 2 hrs
- Elevator spar part 1 4 hrs
- Balance counterweigh assembly & main spar 6 hrs