Timeline
- 12 Aug 3.3 hrs Underseat Cover Plate - Part 2 Fuselage
- 29 Jul 5.5 hrs Installing Underseat Cover Plate Fuselage
- 28 Jul 4 hrs Calibrating Control Surfaces and Cable Routing Fuselage
- 24 Jul 2 hrs Hangar Washing & Aileron Rigging Wing
- 23 Jul 2.5 hrs Parachute Installation - Part 2 Fuselage
- 23 Jul 5.5 hrs Parachute Installation - Part 1 Fuselage
- 21 Jul 2 hrs Post Wing Mounting Work - Part 5 - Installing Ailerons Wing
- 21 Jul 14 hrs Post Wing Mounting Work - Part 4 - The Boost Pump Saga Wing
- 17 Jul 4 hrs Post Wing Mounting Work - Part 3 Wing
- 16 Jul 0.5 hrs Post Wing Mounting Work - Part 2 Wing
- 14 Jul 3 hrs Post Wing Mounting Work - Part 1 Fuselage
- 14 Jul 2.5 hrs Mounting the Left Wing - Part 2 Wing
- 11 Jul 5 hrs Mounting the Left Wing - Part 1 Wing
- 09 Jul 4.3 hrs Mounting the Right Wing - Part 4 Wing
- 07 Jul 4.3 hrs Mounting the Right Wing - Part 3 Wing
- 05 Jul 2 hrs Mounting the Right Wing - Part 2 Wing
- 03 Jul 4 hrs Mounting the Right Wing Wing
- 01 Jul 3.7 hrs Fuselage Prep for Wing Attachment Fuselage
- 30 Jun 4 hrs Wing Mounting Prep - Rod Ends Wing
- 29 Jun 1.5 hrs Wing Mounting Prep - Passenger Seats Fuselage
- 29 Jun 3 hrs Wing Mounting Prep - Center Channel Cover Fuselage
- 28 Jun 9 hrs Wing Mounting Jigs Wing
- 04 Jun 10 hrs Redoing Propeller Safety Wire, Wiring Clean Up, Air Filter Fitting, Oil Purge Engine
- 30 May 3 hrs Installing Propeller Engine
- 28 May 2.5 hrs Clean Up in the Cockpit Fuselage
- 27 May 3 hrs Oil Lines, Air filter Engine
- 26 May 4.5 hrs Oil Lines, Exhaust Pipe, and Cleaning Day Engine
- 21 May 3.5 hrs Misc Firewall Forward Work Firewall
- 19 May 3 hrs Lower Cowling Epoxy Work and Heat Shield Engine
- 18 May 2.5 hrs Control Cover on the Tail Empennage
- 15 May 3 hrs Oil Lines Test Fit Engine
- 14 May 4 hrs Oil Cooler, Oil Lines, and Some Riveting Engine
- 13 May 4.5 hrs Intercooler Fitting Engine
- 13 May 0.8 hrs Air Filter Engine
- 12 May 5.3 hrs Composite is Annoying - Cowling Day 6 Firewall
- 11 May 0.2 hrs Hopply - An App I Built for Managing My Aircraft Misc
- 07 May 3 hrs Cowling Day5: Camlocs & Prepping the Inspection Doors Firewall
- 06 May 8 hrs Coolant System, and EAA Tech Counselor Visit Engine
- 05 May 2 hrs Cowling Day4: Camloc Prep Firewall
- 04 May 4 hrs Coolant System Fluid Lines - Part 1 Engine
- 01 May 5 hrs Misc Firewall Forward Tasks Firewall
- 30 Apr 8 hrs Cowling - Day 3 Firewall
- 28 Apr 9 hrs Cowling - Day 1 & Day 2 Firewall
- 21 Apr 6 hrs Exhaust Pipe - Part 2 Engine
- 19 Apr 1.3 hrs Firewall loom sealing bracket Firewall
- 19 Apr 2 hrs Exhaust Pipe - Part 1 Engine
- 17 Apr 2 hrs Mounting Wing Harness Connector, Wire Management on Firewall Forward Fuselage
- 17 Apr 1.5 hrs Center Fuselage Rib Replacement (Part 2) Fuselage
- 10 Apr 2.7 hrs Spring break Rivet Filling & Rear Fuselage Rib Replacement (Part 1) Fuselage
- 26 Mar 2.5 hrs Engine Harness - Part 6 - Fixing harness wires & testing Engine
- 21 Mar 1.5 hrs Propeller - Part 3 Engine
- 21 Mar 2 hrs Engine Harness - Part 5 - Debugging CAN wires Engine
- 14 Mar 10 hrs Engine Harness - Part 4 - Continue with Wiring Investigation Engine
- 07 Mar 1 hrs Propeller - Part 2 Engine
- 28 Feb 2 hrs Propeller - Part 1 Engine
- 27 Feb 6 hrs Engine Harness - Part 3 - Wiring Issue Engine
- 20 Feb 4 hrs Installing Throttle Cable Engine
- 07 Feb 4 hrs Making Sensor Connectors & PCV Mount Engine
- 07 Feb 3.3 hrs Fuselage rivet filling Fuselage
- 01 Feb 3 hrs Engine Harness - Part 2 - Starter Cables and Fuel Pressure Sender Engine
- 01 Feb 1 hrs Engine Harness - Part 1 - Fusebox and Starter Engine
- 01 Feb 2 hrs Engine Cowling Prep Engine
- 31 Jan 2.5 hrs ECU & HIC Fuselage
- 19 Jan 3 hrs Painting Window Trim and Working on Fuel Pressure Sensor Canopy
- 19 Jan 1.5 hrs Cowling Spacing Jig Engine
- 17 Jan 0.8 hrs Installing new Master Relay Firewall
- 17 Jan 1.5 hrs Attaching the Engine - Part 2 Engine
- 11 Jan 2.3 hrs Painting Window Trim - Part 2 Canopy
- 11 Jan 3.5 hrs Attaching the Engine - Part 1 Engine
- 10 Jan 1 hrs Painting Window Trim Canopy
- 10 Jan 4.3 hrs Firewall Wiring Cleanup, and Master Relay Firewall
- 04 Jan 1 hrs New Door Handles Canopy
- 02 Jan 4.3 hrs Firewall Wiring and Heater Hose Cleanup Firewall
- 01 Jan 2 hrs Installing Passenger Row Floor Fuselage
- 31 Dec 2.7 hrs Bleeding Brakes - Part 2 Undercarriage
- 26 Dec 1.5 hrs Built the Engine Lift Engine
- 26 Dec 1 hrs Continued on Brake Bleeding and Started on ECU Fuselage
- 25 Dec 0.8 hrs Brake Lines on Throttle Quadrant Fuselage
- 25 Dec 1.5 hrs Bleeding Brakes (1st Attempt) Undercarriage
- 24 Dec 1 hrs Making Throttle Cable Connection Rod End Fuselage
- 24 Dec 2 hrs Misc work to Prepare for Engine Install Engine
- 19 Dec 2.5 hrs Regulator B Ground Wire & Misc Clean Up Firewall
- 13 Dec 4 hrs Starter Relay and Fusebox, Regulator Firewall
- 06 Dec 3.8 hrs Misc Work on Firewall Forward Firewall
- 28 Nov 4 hrs Adjusting Fuel Selector and Fuel Lines Fuselage
- 22 Nov 4 hrs Fuel Selector Install Fuselage
- 21 Nov 1.5 hrs Protecting Throttle Quadrant with Vinyl Fuselage
- 16 Nov 2.7 hrs Completed the Fuel Pumps & Naviflow Assembly Firewall
- 01 Nov 1.5 hrs Rotax Fuel Pumps wiring and Installing to Firewall Firewall
- 24 Oct 4 hrs Building the Fuel Pumps and Naviflow Firewall
- 19 Oct 3 hrs Fuel Selector Fittings Fuselage
- 19 Oct 3 hrs Completed ELT Wiring Fuselage
- 18 Oct 4 hrs Moving Engine to Hangar Engine
- 18 Oct 4 hrs Odds and Ends on Canopy Canopy
- 12 Oct 9 hrs Installing the windshield Canopy
- 12 Oct 0.8 hrs Dispose Canopy Crate Misc
- 11 Oct 0.8 hrs Installing doors Canopy
- 05 Oct 8 hrs Copilot door window Canopy
- 04 Oct 4.5 hrs Rear floor shutoff skin and transponder antenna hole cover Fuselage
- 27 Sep 6 hrs Pilot Door Window: Part 2 Canopy
- 26 Sep 1 hrs Pilot Door Window: Part 1 Canopy
- 25 Sep 0.3 hrs Checked GPS Antenna Installation Fuselage
- 21 Sep 4.5 hrs Installing right rear window Canopy
- 14 Sep 6 hrs Installing left rear window Canopy
- 06 Sep 2 hrs Engine inspection and pallet jack Engine
- 31 Aug 2 hrs Starting to prep rear windows Canopy
- 31 Aug 3.2 hrs Door latch rail cover Canopy
- 24 Aug 1 hrs Door latch center slide Canopy
- 24 Aug 2 hrs Rebuilt battery cables, installed shunt cover Firewall
- 16 Aug 0.7 hrs Rebuilt passenger door latch Canopy
- 16 Aug 5.3 hrs Airmaster controller, FP1 connector Fuselage
- 09 Aug 0.5 hrs Re-installing GTP 59 (OAT Probe) Wing
- 09 Aug 11.3 hrs Installing Instrument Panel & Prepping Fuel Selector Fuselage
- 03 Aug 3 hrs Closed the Top Front Skin Fuselage
- 27 Jul 5 hrs Continuing Firewall Forward, 4 hours 4 screws Firewall
- 26 Jul 3 hrs Installing Firewall Forward Parts Firewall
- 13 Jul 0.3 hrs Installing GTP 59 (OAT Probe) Wing
- 04 Jul 4 hrs Side upholstery panels Fuselage
- 03 Jul 10 hrs Door latches Canopy
- 01 Jul 1.3 hrs Fixed GMU11 connection Fuselage
- 29 Jun 5 hrs First power on! Fuselage
- 29 Jun 2.7 hrs Starting on door latch Canopy
- 28 Jun 2 hrs Rear Fuselage Trim Cover Fuselage
- 28 Jun 6 hrs Firewall Forward Wiring Firewall
- 27 Jun 2.5 hrs Test fitting throttle quadrant Fuselage
- 27 Jun 3 hrs Installing back side skin Fuselage
- 26 Jun 3 hrs Center console work Fuselage
- 25 Jun 8 hrs Routing misc wires and fluid lines Fuselage
- 25 Jun 3.3 hrs Wiring on the firewall forward Firewall
- 25 Jun 2.5 hrs Finishing up trim motor and rudder cable Empennage
- 22 Jun 7.5 hrs Final assembly: vertical stabilizer and rudder Empennage
- 21 Jun 8 hrs Lots of things before putting on dashboard Fuselage
- 21 Jun 4 hrs Rigging the elevator Empennage
- 20 Jun 40 hrs Rotax engine service training Misc
- 15 Jun 1.5 hrs Routing some more wires before instrument panel Fuselage
- 15 Jun 6 hrs Side panel upholstery and floor doubler Fuselage
- 14 Jun 7 hrs Test fitting instrument panel and more prep: cabin heater work, upholstery etc Fuselage
- 13 Jun 2 hrs Preparing instrument panel fitting Fuselage
- 13 Jun 1 hrs Elevator push rod Empennage
- 12 Jun 2 hrs Installed the elevator Empennage
- 10 Jun 3 hrs Mounting control stick wiring connector to airframe Fuselage
- 09 Jun 6 hrs Boost pump controller, cabin heat duct, and upholstery Fuselage
- 09 Jun 2 hrs Re-installing boost pumps Wing
- 05 Jun 0.3 hrs Airmaster propeller inventory Firewall
- 29 May 4 hrs Routing avionics harness Fuselage
- 29 May 1 hrs Remove Boost Pumps Wing
- 16 May 3 hrs Takes a village... flaring fuel lines Wing
- 10 May 2 hrs Installing the rear seat stoppers Fuselage
- 10 May 0.7 hrs Comm2 Antenna Fuselage
- 10 May 1 hrs Cabin heater ducts Fuselage
- 30 Apr 3 hrs Cabin heather assembly Fuselage
- 30 Apr 2.5 hrs Fuel boost pump plumbing test Wing
- 25 Apr 1 hrs Installing horizontal stabilizer Empennage
- 19 Apr 5 hrs Front inner skin Fuselage
- 13 Apr 0.3 hrs NotebookLM Misc
- 01 Apr 7.7 hrs Audio jack issues Fuselage
- 29 Mar 2 hrs Audio jack ground loop(??) Fuselage
- 28 Mar 6 hrs EAA Tech Counsel on Fuselage Work Misc
- 26 Mar 13 hrs Boost Pump Upgrade Wing
- 19 Mar 5 hrs Moving fuselage to the hangar Misc
- 13 Mar 7.5 hrs Wiring harness (part 5): Antennas and more wires Fuselage
- 12 Mar 1 hrs Cold air ducts Fuselage
- 06 Mar 3 hrs Wiring harness (part 4) & coax Fuselage
- 05 Mar 12 hrs Continue on wiring harness (part 3) Fuselage
- 02 Mar 3.3 hrs Leather seat & throttle quadrant vinyl part 2 Fuselage
- 28 Feb 1.5 hrs Leather seat! And throttle quadrant vinyl Fuselage
- 27 Feb 4 hrs Continue on wiring harness Fuselage
- 26 Feb 3.3 hrs Working on avionics rack Fuselage
- 25 Feb 9 hrs Preparing for top front skin installation Fuselage
- 19 Feb 2.5 hrs Finishing luggage door and designing throttle quadrant label Fuselage
- 18 Feb 2 hrs Routing harness part2: wing connectors and GTR 205xR Fuselage
- 17 Feb 3 hrs Starting to route harness, and relocating ELT Fuselage
- 12 Feb 6 hrs Luggage area carpeting continued Fuselage
- 10 Feb 4.5 hrs Some riveting, and starting on carpet (luggage extension) Fuselage
- 09 Feb 5 hrs Moving wings to hangar Misc
- 08 Feb 10.5 hrs Installing Antenna Mounting Plates Fuselage
- 06 Feb 5 hrs Brake lines from gear leg and fuselage Undercarriage
- 03 Feb 0.6 hrs Rudder cable guides Fuselage
- 02 Feb 4 hrs Pilot side control stick Fuselage
- 01 Feb 2.5 hrs Avionics rack support Fuselage
- 28 Jan 2.5 hrs Autopilot Servos Fuselage
- 27 Jan 8 hrs Seat belts Fuselage
- 26 Jan 0.8 hrs Installed the luggage door Fuselage
- 25 Jan 3 hrs Started to work on brake lines Undercarriage
- 24 Jan 4 hrs Bolted the rear parachute cable Fuselage
- 23 Jan 6 hrs Control joystick torque tube install Fuselage
- 20 Jan 2.5 hrs Engine mount issue and rudder rod boot Firewall
- 19 Jan 0.4 hrs She's on the ground! Misc
- 18 Jan 4 hrs Installing the wheels Undercarriage
- 16 Jan 3.3 hrs Rear fuselage: pulling rivets Fuselage
- 15 Jan 5 hrs Canopy part 3: installation Canopy
- 14 Jan 4 hrs Main landing gear shim Undercarriage
- 12 Jan 2.5 hrs Fuselage misc: rivet filling, countersink and throttle quadrant Fuselage
- 11 Jan 10 hrs Canopy part 2: fitting and drilling Canopy
- 09 Jan 1 hrs Putting on the main landing gear Undercarriage
- 08 Jan 1.5 hrs Installed ELT Fuselage
- 06 Jan 1.7 hrs Firewall mounting part 2: fire barrier and naviflow Firewall
- 05 Jan 2 hrs Side skin misc: sound proofing and air channel sealing Fuselage
- 03 Jan 3 hrs NACA Duct & Static port Fuselage
- 02 Jan 6 hrs Canopy part 1: paint and wiring Canopy
- 01 Jan 1.5 hrs Rear fuselage: luggage door and seat stop brackets Fuselage
- 31 Dec 0.8 hrs Rear fuselage: covering the remaining top skin Fuselage
- 30 Dec 1.5 hrs Landing wheels Undercarriage
- 29 Dec 16 hrs Building the nose gear assembly Undercarriage
- 25 Dec 6 hrs Firewall mounting part 1 Firewall
- 23 Dec 7 hrs Side skin part 3 Fuselage
- 22 Dec 4 hrs Side skin continued Fuselage
- 21 Dec 2.3 hrs Starting to install side skin Fuselage
- 20 Dec 12 hrs Fitting control rods & rear seat channel Fuselage
- 17 Dec 4.3 hrs Throttle quadrant Fuselage
- 19 Nov 25 hrs Fitting control rods & prepping side skin Fuselage
- 09 Nov 3 hrs Center fuselage connection and bottom floor skin Fuselage
- 08 Nov 2.5 hrs Adding rudder pedals Fuselage
- 03 Nov 6 hrs Building rear seats Fuselage
- 01 Nov 4 hrs Center fuselage connection prep Fuselage
- 31 Oct 4 hrs Undercarriage: nose wheel and front fork Undercarriage
- 28 Oct 7.5 hrs Center fuselage: ribs and floor skin Fuselage
- 24 Oct 2.5 hrs Rear fuselage: covering (half of) the top skin Fuselage
- 19 Oct 2.5 hrs Rear fuselage: Misc work before closing the top skin Fuselage
- 16 Oct 1.3 hrs Center fuselage: rib onto main spar Fuselage
- 15 Oct 0.8 hrs Matco brake upgrade Undercarriage
- 14 Oct 5 hrs Front row seats Fuselage
- 13 Oct 3 hrs Starting center fuselage: rear spar and main spar Fuselage
- 10 Oct 4 hrs Rear fuselage: luggage area, static port, GMU 11 Fuselage
- 09 Oct 1.5 hrs Rear fuselage: a problem with luggage floor skin Fuselage
- 08 Oct 10 hrs Rear fuselage skin & fixing a damaged inner skin Fuselage
- 04 Oct 5 hrs Rear fuselage rib assembly Fuselage
- 28 Sep 5 hrs Rear fuselage: rib 2,3,4,5 and longeron 8 Fuselage
- 24 Sep 6 hrs Starting on rear fuselage: rib 6,7,8,9 Fuselage
- 22 Sep 3.5 hrs Left tank: part 3 (leak test and install) Wing
- 19 Sep 1 hrs Left wing: aileron and flap fully riveted Wing
- 18 Sep 1 hrs Left wing: nav light is on Wing
- 16 Sep 3 hrs Left wing: wing tip Wing
- 15 Sep 4 hrs Left tank: part 2 (Sealing back channel) Wing
- 12 Sep 5 hrs Remaking left landing light cover - Part 2 Wing
- 08 Sep 10 hrs Left tank, part 1 (Sealing ribs and skin) Wing
- 05 Sep 3 hrs Left tank match drilling, left wing root trailing edge Wing
- 03 Sep 2.5 hrs Left wing skin misc clean up, and discussing panel with MPB Wing
- 01 Sep 3 hrs Completing the right fuel tank Wing
- 29 Aug 6 hrs Remaking left landing light cover - Part 1 Wing
- 28 Aug 2 hrs Left wing: landing light cover and fuel level sender Wing
- 25 Aug 4 hrs Mocking left tank and filling rivets Wing
- 17 Aug 12 hrs Right wing: lights and lens, wing tip and wing stand Wing
- 11 Aug 15 hrs Prosealing the right fuel tank, left wing leading edge & lights Wing
- 03 Aug 2 hrs Left top skin, and landing lights Wing
- 29 Jul 2 hrs Misc work, but mostly fuel tank Wing
- 27 Jul 8 hrs Right leading edge and fuel tank prep Wing
- 14 Jul 4 hrs Right leading edge done Wing
- 08 Jul 1.3 hrs Built the left flap Wing
- 07 Jul 5 hrs Fuselage kit arrived, and left aileron Wing
- 04 Jul 5 hrs Installing pitot tube Wing
- 02 Jul 3 hrs Left bottom skin riveted Wing
- 30 Jun 2 hrs Left bottom skin clecoed, and some rivet drilling Wing
- 29 Jun 3 hrs Right aileron, flap, trailing edge, and left spar Wing
- 24 Jun 1.5 hrs Right leading edge skin damage Wing
- 23 Jun 9 hrs Lots of things going on the right wing, and starting on the left Wing
- 19 Jun 2 hrs Right aileron part prep Wing
- 18 Jun 2 hrs Right leading edge done Wing
- 17 Jun 3 hrs Clecoing left ribs, and update on rivet gun Wing
- 16 Jun 8 hrs Right top skin and leading edge Wing
- 14 Jun 4 hrs Rib 9 fix, and starting right top skin Wing
- 11 Jun 4 hrs right wing harness Wing
- 09 Jun 2.3 hrs Working on right top skin and left ribs Wing
- 07 Jun 3 hrs Right bottom skin riveted Wing
- 05 Jun 5.5 hrs Right bottom skin fitting and an successful experiment Wing
- 04 Jun 4 hrs Right spar assembly 4 complete, started assmebly 3 Wing
- 01 Jun 3 hrs Starting to rivet ribs to spar Wing
- 31 May 3.5 hrs Cleaning left ribs, and found a crack Wing
- 30 May 7 hrs Right wing ribs, and lots of debur Wing
- 27 May 6 hrs Getting started on the right wing (rear spar and a few ribs) Wing
- 18 May 0.2 hrs Wing kit and dimple template Wing
- 10 May 0.2 hrs Misc non-build updates Misc
- 13 Mar 0.5 hrs Trim motor install Empennage
- 09 Mar 0.5 hrs Elevator rivet filling Empennage
- 01 Mar 2 hrs Elevator trim tab install Empennage
- 29 Feb 1 hrs Trim motor wiring Empennage
- 28 Feb 6 hrs Mounting elevator tip Empennage
- 25 Feb 2 hrs Elevator tip forming and shortening rivets Empennage
- 22 Feb 3 hrs Elevator bottom skin, and trim motor hardware Empennage
- 20 Feb 1 hrs Elevator trim tab fitting problem Empennage
- 18 Feb 2 hrs Elevator skin fitting and safety wire Empennage
- 17 Feb 2 hrs Elevator skin prep and inspection hatch Empennage
- 14 Feb 1.5 hrs Vertical stabilizer complete Empennage
- 09 Feb 1.5 hrs Vertical stabilizer wiring Empennage
- 08 Feb 2 hrs Elevator rib1 rework and spar Empennage
- 07 Feb 3 hrs Vertical stabilizer rib1 and skin work Empennage
- 06 Feb 1.5 hrs Wiring delphi connector for tail light Empennage
- 03 Feb 1.5 hrs Vertical stabilizer spar riveting Empennage
- 02 Feb 1 hrs Horizontal stabilizer and elevator stand Misc
- 30 Jan 5 hrs Horizontal Stabilizer Close Empennage
- 26 Jan 2 hrs Wire standoff and EAA Tech Counseling visit Misc
- 21 Jan 4 hrs Elevator spar part 1 Empennage
- 20 Jan 4 hrs HS skin dimple and cleco Empennage
- 16 Jan 1.5 hrs HS skin dimple attempt Empennage
- 14 Jan 3 hrs HS spar riveting and skin prep (kinda) Empennage
- 13 Jan 2 hrs Clecoing and adjust HS front spar Empennage
- 12 Jan 3 hrs Back to HS front spar Empennage
- 11 Jan 8 hrs Starting on vertical stabilizer Empennage
- 11 Jan 1 hrs Installing Taillight Empennage
- 29 Dec 10 hrs Rudder assembly Empennage
- 24 Dec 3 hrs Horizontal stabilizer spar Empennage
- 21 Dec 6 hrs Balance counterweigh assembly & main spar Empennage
- 18 Dec 2 hrs Countersink, more cleaning, and clecoing Empennage
- 15 Dec 3 hrs Parts cleaning and priming Empennage
- 11 Dec 3 hrs Empennage arrived!! Empennage
- 04 Nov 2 hrs DRDT-2 Stand Misc
- 16 Oct 0.8 hrs DRDT-2 Misc
- 01 Oct 10 hrs Builing EAA 100 WorkBench Misc
- 17 Sep 2 hrs Priming experiment Misc
- 03 Sep 2 hrs Alodining and priming Misc
- 02 Sep 3 hrs Day 1, setting up this site! Misc