Post Wing Mounting Work - Part 2
Post Wing Mounting Work - Part 2
TLDR
- Torqued left flap
- Received Parachute
Details
Left Flap
I only got to stay in the hangar for 30 minutes or so today. Did a quick thing - replaced short bolts that I used to temporarily hang the left flap with proper length ones (AN4-7) and torqued them.
Parachute
Also, when I returned home I was right in time for FedDx delivery. It’s my parachute. It came in 2 packages - the main parachute itself and the rocket box.
I loaded them up in the car, and will bring it to the hangar tomorrow/next week for deep dive.
This post is licensed under CC BY 4.0 by the author.