flap 14
- Calibrating Control Surfaces and Cable Routing
- Post Wing Mounting Work - Part 2
- Mounting the Left Wing - Part 2
- Mounting the Right Wing - Part 4
- Mounting the Right Wing - Part 3
- Fuselage Prep for Wing Attachment
- Test fitting throttle quadrant
- Left wing: aileron and flap fully riveted
- Right wing: lights and lens, wing tip and wing stand
- Built the left flap
- Fuselage kit arrived, and left aileron
- Right aileron, flap, trailing edge, and left spar
- Lots of things going on the right wing, and starting on the left
- Starting to rivet ribs to spar