~left_tank 6
Time logged: 26.5 hrs
- Entry Time spent
- Left tank: part 3 (leak test and install) 3.5 hrs
- Left tank: part 2 (Sealing back channel) 4 hrs
- Left tank, part 1 (Sealing ribs and skin) 10 hrs
- Left tank match drilling, left wing root trailing edge 3 hrs
- Left wing: landing light cover and fuel level sender 2 hrs
- Mocking left tank and filling rivets 4 hrs