~right_skin 14
Time logged: 49.2 hrs
- Entry Time spent
- Re-installing GTP 59 (OAT Probe) 0.5 hrs
- Installing GTP 59 (OAT Probe) 0.3 hrs
- Mocking left tank and filling rivets 4 hrs
- Right leading edge and fuel tank prep 8 hrs
- Right leading edge done 4 hrs
- Left bottom skin clecoed, and some rivet drilling 2 hrs
- Right leading edge skin damage 1.5 hrs
- Right leading edge done 2 hrs
- Right top skin and leading edge 8 hrs
- Rib 9 fix, and starting right top skin 4 hrs
- Working on right top skin and left ribs 2.3 hrs
- Right bottom skin riveted 3 hrs
- Right bottom skin fitting and an successful experiment 5.5 hrs
- Right spar assembly 4 complete, started assmebly 3 4 hrs