Undercarriage 11
Time logged: 43.4 hrs
- Entry Time spent
- Bleeding Brakes - Part 2 2.7 hrs
- Bleeding Brakes (1st Attempt) 1.5 hrs
- Brake lines from gear leg and fuselage 5 hrs
- Started to work on brake lines 3 hrs
- Installing the wheels 4 hrs
- Main landing gear shim 4 hrs
- Putting on the main landing gear 1 hrs
- Landing wheels 1.5 hrs
- Building the nose gear assembly 16 hrs
- Undercarriage: nose wheel and front fork 4 hrs
- Matco brake upgrade 0.8 hrs