wing_rib 12
- Left tank, part 1 (Sealing ribs and skin)
- Misc work, but mostly fuel tank
- Right leading edge and fuel tank prep
- Lots of things going on the right wing, and starting on the left
- Clecoing left ribs, and update on rivet gun
- Rib 9 fix, and starting right top skin
- Working on right top skin and left ribs
- Right spar assembly 4 complete, started assembly 3
- Starting to rivet ribs to spar
- Cleaning left ribs, and found a crack
- Right wing ribs, and lots of debur
- Getting started on the right wing (rear spar and a few ribs)