~right_aileron 8
Time logged: 38 hrs
- Entry Time spent
- Hangar Washing & Aileron Rigging 2 hrs
- Post Wing Mounting Work - Part 5 - Installing Ailerons 2 hrs
- Wing Mounting Prep - Rod Ends 4 hrs
- Mocking left tank and filling rivets 4 hrs
- Right wing: lights and lens, wing tip and wing stand 12 hrs
- Right aileron, flap, trailing edge, and left spar 3 hrs
- Lots of things going on the right wing, and starting on the left 9 hrs
- Right aileron part prep 2 hrs